Client

Thiess Pty Ltd

Budget

$1,500,000

Services Rendered

  • NATA Annex facility set-up
  • Quality control field and laboratory testing on rail track alignment works
  • Quality control field and laboratory on Peak Down Hwy (QMR) Spec requirements
  • Quality control sampling and verification testing for Quarry material supply

Experience & Skills Supplied/Developed

  • Highly experienced Construction Materials Testing team
  • BMA Core Induction
  • Mine site defensive driving
  • FIFO scheduling and logistics
  • Establishment of NATA accredited testing facility
  • Train track Safety Awareness Compliant – Level 1
  • Holistic integration of our technical team

Caval Ridge Bulk Earthworks

Project includes a new coal mine and a coal handling and preparation plant (CHPP). The new Caval Ridge Mine will have the capacity to produce 5.5 million tonnes per annum and the CHPP will also process an additional 2.5 million tonnes per annum of product coal from the expansion of the neighbouring Peak Downs Mine, which will be transported via conveyor.

Project started April 2013 and is still Ongoing.