Client

McConnell Dowell / Major Roads Projects Victoria

Budget

$380,000

Services Rendered

  • Instrumentation
  • Drilling
  • Laboratory Testing
  • Field Engineering

Deliverables

  • 19 Boreholes at varying depths between (7.5m – 30m)
  • Cone Penetrometer Tests
  • 7 Pavement Dippings at varying depths between 1.0m and 3.0m
  • Instrumentation, Installation, Supply and ongoing monitoring:
    o Vibrating Wire Peizometer, Magnetic Extensometer, Data
    Loggers, Insitu Settlement plates, Telemetry Data hosting of Instruments
  • Laboratory: Atterberg Limits, Particle Size Distribution, Consolidation, Unconsolidated Undrained Triaxial, Particle Density, Point Load Strength Index, Dispersive Tests, California Bearing Ratio, Compaction, Uniaxial Compressive Strength, Aggressivity (pH, Conductivity, Sulphates, Chlorides), Direct Shear.

Healesville Koo Wee Rup Road North Upgrade

As a part of the Healesville Koo Wee Rup Road upgrading intersections and installing safety barriers between Princes Freeway and Manks Road.