Client

Fulton Hogan Constructions Pty Ltd (MRPA)

Budget

$230,000

Services Rendered

  • Instrumentation
  • Drilling
  • Laboratory Testing
  • Field Engineering

Deliverables

  • 7 Boreholes from: 5.0 to 35.0m
  • 4 Cone Penetrometer Tests
  • 23 Pavement Dippings
  • Atterberg Limits, Particle Size Distribution, Consolidation, Unconsolidated Undrained Triaxial, Particle Density, Point Load Strength Index, California Bearing Ratio, Compaction, Uniaxial Compressive Strength, Aggressivity (pH, Conductivity, Sulphates, Chlorides), Direct Shear

Progress Street, Dandenong South

As a part of the Metropolitan Roads Program Alliance (MRPA) Chadwick Geotechnics provided a series of geotechnical and pavement investigations for the Progress Street Level Crossing Removal (LXR) and associated laboratory testing at Progress Street in Dandenong South.